EV Charger Installation | Three Phase
● rcbo 32a protection device in the existing utility panel box
● includes up to 5m three-phase cable run from the switchboard
● the charging station will be fully tested and certified as operational
Notes
*the installation only makes provisions for utilising a customer’s existing switchboard. It does not include costs involved in having to upgrade the switchboard
** the installation makes provision for cable run up to 5 meters of a buildings electrical box only.
***ev charger sold separately
SPRINGERS
ANL050
EV Chargers EV Chargers